Insulation and plumbing


Now the spray foam insulation is in all over the house.  It only took 2 days!  It seems to be going quickly.  Also, the plumbing and electricity is going in before the sheetrock goes up.  We had to do a walk-through with the electrician, builder, decorator, my husband, and me to decide where to have the outlets and switches placed.  Because of flood restrictions, we have to have the switches in the garage almost 6 feet off the floor.  I have always been vertically challenged so I hope I can reach them!